Case history
Education: Teign School – New Science Block – Kingsteignton
Education: Teign School – New Science Block – Kingsteignton The project is the construction of a new Science Block on the campus of Teign School, Kingsteignton.
Residential – Private: Summerfield Development – Sidmouth
Residential – Private: Summerfield Development – Sidmouth Demolition of an existing house and swimming pool, complete site clearance and construction of five new timber frame houses.
Residential – Private: Construction of a PassiveHaus – Mosshayne Farm
Residential – Private: Construction of a PassiveHaus – Mosshayne Farm The project is the construction of a Passivehaus dwelling at Mosshayne Farm, Westclyst, Exeter.
Residential: Passivehaus Development (10 Properties) – Exeter
Residential: Passivehaus Development (10 Properties) – Exeter The project is the construction of a new catering classroom on the campus of The King’s School, Ottery St Mary.
Education: New Catering Classroom – The King’s School, Ottery St Mary
The King’s School, Ottery St Mary – New Catering Classroom The project is the construction of a new catering classroom on the campus of The King’s School, Ottery St Mary.
Education: New build, Bicton
Bicton College – Earth Centre Construction of a renewable training centre, which consisted of the conversion of existing farm yard barns and the construction of building sections to link the existing barns together.
Education: BREEAM accredited school extension, Exeter
Exeter School, Exeter This project was Phase 2 of three phases to provide new changing and other rooms and a new covered swimming pool.
Private Dwelling: New build, Lympstone
The demolition of an existing dwelling to allow the construction of a new bespoke ultra modern dwelling with landscaping works. This project demanded high quality throughout from concept to completion and value engineering was used to assist the client’s budget
Find out more
Healthcare: Alterations and fit-out, Sidmouth
Sidmouth Hospital, Devon The reconfiguration of part of the existing ground floor, including providing a new entrance canopy.
Education: Reinstatement works after fire, Parracombe
Parracombe School, North Devon This project involved the complete demolition of the existing school buildings whilst maintaining and protecting the structural integrity of the existing Grade 2 listed school hall that the school building was attached to.